Mistral Elementary construction

2020 Solar and Perimeter Fence projects

(Funded by Measure T)

Measure T, the $259 million bond issue passed in 2020, included plans for a variety of projects that will increase safety, efficiency and provide for short-term growth at our schools. 

HVAC
HVAC filter replacements have been completed, and accordance with the CDC and County guidelines, will increase airflow and filtration reduce the chance of coronavirus spread. 

Security
Improving perimeter fencing and adding gates to completely enclose campus and fields in order to secure campuses and make COVID screening more efficient. Fencing and gates would be ornamental metal to match existing at campus frontage and 6’ high chain link fencing and gates at property lines and back of campus.  The construction timeline for this project is estimated to be October-January. 

The purpose of fencing is to control points of entry during school hours. It’s important to note that the public will have access to fields outside school hours. The intention is to secure campuses when students are present, and have gates open through a lock management system in the evenings and on weekends. 

Addition of self closing hinges to the two gates near the kinder wing/fire lane, and replacement six-foot ornamental metal fencing at the entrance to the right of the office building. Extension of the height of the field fence on Latham Street (runs from the preschool to Castro school) from 4 feet to 6 feet. This improvement to the existing fence is for the purpose of securing the Castro/ Mistral campus. It is separate from any future fence project that dedicates play area to the preschool. 

Click here for the perimeter fencing map (user friendly)
Click here for the Castro/Mistral Community Meeting Presentation
 
Solar
At the June 14, 2018 meeting the Board gave direction to continue with the concept of solar panels in MVWSD. In May 2020, the district got feedback on the design and placement of the solar arrays. The District is currently working with Engie and Sage on contract revisions and hopes to bring a contract to the board in October 2020.

Lighting
New light standards and/or bollard style light post to illuminate path of travel to/from campus and parking lots.

Public Restrooms
Castro/Mistral will purchase and install prefabricated, standalone toilet buildings. The units would be maintained by the City and may be used afterhours by the public. This is an important security measure to ensure adults are not mixing with children in student restrooms.

Window Replacement
The District will replace existing, older single pane windows at Mistral.

2018-2020 Classrooms Remodel, Kinder Building, Library and Playgrounds

(Funded by Measure G)

Castro/Mistral construction postcard, May 2018 (En español)

Summer 2020
Mistral Administration Building: The renovation of the Mistral Administration Office and the Preschool at Latham exterior walkway and fence projects has been delayed until 2021.

Summer 2019
Construction on the play structure additions is complete.

The school will get a new sign in the front, likely by the end of August. This sign, paid for with Measure G funds, will include accurate school and district names. Funding for construction and capital improvements, like school signs, come from restricted funds that can be used only for that purpose. The District used an innovative approach to piggyback on existing, competitive local government contracts to lower the sign cost and expedite installation.

Summer/Fall 2018
All of Castro and some of Mistral's teachers packed and moved to new classrooms over the summer. At Mistral, the District remodeled classrooms, and built new classrooms, as well as a new library and a multi-use room, shared with Castro. Three kindergarten classes moved into their new classrooms over the winter break for start of school in January.

Mistral's main entrance moved to the north. A new driveway was created, extending the loading zone.

The former Castro/Mistral multi-use room on Escuela was torn down to make way for the Mistral kindergarten wing construction. The new kinder wing is complete.

Additionally, Escuela Avenue in front of the school underwent construction as part of a separate City of Mountain View project. The Escuela parking lot was renovated to increase traffic flow and improve safety. 

Temporary portables out on the yard and field were removed. The asphalt was repaired and expanded to include a basketball court and large play structure. The grass area received new sod.  

Preschool area: There is new fence installed along the expanded sidewalk in front of the Preschool, to create a more secure area for the Preschool students/families. The Preschool will also get new play areas within the dedicated Preschool mini-campus.

Library conversion: The Library was converted to two Flex Rooms, with one of them being designated for YMCA.




Castro construction chart

The District has worked very hard over the years to do the work, funded by Measure G, to make facilities improvements and renovations at every school a reality. The results will be amazing. There will be new and updated classrooms, libraries and MURs. However, construction requires extra accommodations. We appreciate your support and understanding as we take one step closer to improving each of our schools for our students, staff and community.

During the 2017-18 school year
Construction on the new Castro School continued behind the construction fence. Castro school steel framing happened in the fall of 2017, and roofs were installed. 

Completed in 2016-17
A village of temporary housing portables was created in December 2016 for use for 18 months for classrooms, education areas and offices to be used during construction, the removal of the existing portables and the demolition of the back wing of classrooms currently housing transitional kindergarten and other classes.

In February 2017, demolition of the existing buildings occurred on the south-east side of the campus to make way for the construction of the new Castro Elementary School and shared Multi-Use Room and Library.

In February 2017, the Toft Street parking lot and turn-around was closed. There is no public access for parking or drop off to Castro/Mistral from Toft for the next 16 months.

Modernization of 16 existing classrooms is complete. The frame for the new Castro School has been walled in, and the MUR frame is erected.

Schedules are subject to change. Check back for updates here.

Phased construction maps
Phase 2 Phase 4

Castro construction postcard, Sept. 2016  (En espanol)

Castro construction postcard, Nov. 2016 (incluye Español)

Click here for the summer construction postcard update, May 12, 2017 (en español)

 

Website by SchoolMessenger Presence. © 2020 Intrado Corporation. All rights reserved.